As of the biggest 3 manufacturers of dry mortar mix plant mixer in Zhengzhou of China, Henan Ant Construction plays a very important role in the dry mortar mixer plant production in China, customers who use our dry mortar mix production line urgently ask us to publish technical articles on winter maintenance rules for dry morar production line as soon as possible. Now we will share with customers the precautions for winter maintenance of dry mortar mix machine complete set equipment.
The complete set dry mortar mix plant and production line includes dual-axis non-gravity mixer, ready-mixed hopper, packaging machine, finished product silo, pulse dust collector, electrical control system and other equipment. The automatic dry mortar complete dry mortar production line is also equipped with raw material silo, automatic the batching system, screw conveyor and bucket elevator, etc., let's introduce the winter maintenance precautions of each component.
Henan Ant Construction recommends a thorough cleaning of the dry mortar mix plant in winter which is not busy season. Because the main component of dry mortar or putty powder is dry powder material, poder dust is the main factor that affects the normal operation of various components. Although the mix production line plant is equipped with dust removal equipment, it is difficult to avoid dust in the actual operation process in the long working time. If it is not cleaned in normal times, it will accumulate more and more dust over time which will eventually affect the normal operation of the equipment. Dust in equipment seals and bearing joints should be handled carefully. Dust in these positions are more likely to cause equipment failure. Excessive dust in the electrical control parts will affect the poor electrical contact and poor air path.
There are many motors and many bearings used in dry mortar and wall putty production line. The bearing position should be filled with lubricating grease regularly. In winter, the wear of the bearing should be checked while adding the grease. Replacement in time is necessary for the severely worn bearings, seals, and oil seals. Double-shaft non-gravity dry mortar mixer, finished product silo, bucket elevator and other equipment are equipped with reducers. Addition and replacement of reducer oil is necessary, it is best to replace lubricating oil with good fluidity in winter.
Check whether the belt of the bucket elevator is off track and whether the bucket is damaged. Adjust the belt and replace the bucket in time if there is any problem. The screw conveyor should also be carefully inspected to see if there is any other mateirals and the spiral blades are deformed and worn. If any problems are found, adjust and replace them in time.
Check the circuit and gas path of the whole production line,
Check whether the cables and wires are damaged and leak electricity, replace damaged cables and wires to reduce the occurrence of safety hazards, check the gas path, butterfly valve, and interface for air leakage, and find the leaking interface in time replace.
Generally speaking, the winter maintenance of the dry mortar and putty powder complete mix production line needs to be more careful and prudent.