Attentions when installing wall putty powder mixer machine
Author:ANT CONSTRUCTIONS Comefrom: Createdate:2020/10/12 11:28:32 Hits:17

Attentions when installing wall plaster putty powder mixer machine

horizontal dry mix plant automatic (177).jpg

Choosing suitable wall plaster putty powder mixer machine before installing a putty powder production plant is the most important key. After choosing a putty powder production equipment that suits you, the installation of the equipment is generally responsible by the putty powder equipment manufacturer, so what should be attention when installing the putty powder production equipment?

Budget, production capacity and the required plant area-wall putty powder mixer machine

First of all, when choosing putty powder production equipment, you should consider your budget, production capacity and the required plant area, then choose the appropriate equipment according to your actual situation. Henan Ant Constructions will support the customized service of the equipment and customize the equipment according to your demand.

Raw materials storaging-wall putty powder mixer machine

The storaging problem of raw materials needs to be considered before the installation of putty powder production equipment. The production process of putty powder is to mix dry powder raw materials. The raw materials must be dry. The raw materials cannot be stored too far away from the putty powder mixer, otherwise it will affect the output. You can refer to the storing and stacking method of dry mortar raw materials: dry mortar production is generally select cement storage silo  qty according to the size of the project, and the bulk cement is stored in silos according to different manufacturers, varieties, labels, and batches. Coarse aggregates are stored in grades in different storage tank. The storage of coarse and fine aggregates should be divided into qualified areas and areas to be inspected, separated by partition walls. Different materials and different sizes materials shall not be storage together. A one-way drainage slope should be set up in the aggregate cleaning area of the sand and gravel storage site; the quality inspection status identification of the material shall be carried out according to the regulations. The identification includes the material name, origin, specification, quantity, feeding time, inspection status, test report number, and inspection batch. In fact, the production of putty powder is basically the same as the production of dry mortar, and you can learn from its experience.

Finished products processing-wall putty powder mixer machine

The installation of putty powder production line equipment should also consider the stacking of finished products. Large output produces more finished products in one day. Storage and transportation will take up a lot of manpower and material resources. A reasonable plan can save a lot of capital. In addition, the demand for electricity from the equipment also needs to be taken into consideration. Any problem in any link may affect future production.